Web Application

rio tinto logos idQ9A 0fs1.png

 

Role: Lead UI Designer

Project: Rio Tinto Shutdown Cockpit Project

Tech: SAP UI5

UI/UX Tool: Figma

Consultancy: Accenture

Brand Guidelines & Colours (Extended)

 

 

The project lead required an extention of the existing Rio Tinto brand colours and simlified guidelines for the details of the SAP graphs/analytics and overall project.

Shut Down Cockpit Metrics

Calendar View (Gant Chart)

Shutdown Meetings

Project Timeline: 5 Months 

Onsite in Perth W.A and flown weekly to the Pilbara to run UX workshops.